White Papers Supporting Tranquility
Technical documentation covering infrastructure planning, power systems, cooling methods, construction logistics, and operational models for 35 GW lunar AI compute deployment.
Full Paper Set: The complete Tranquility paper set is available as a packaged library on request (HTML + DOCX). Email info@pinkhouse.tech
Infrastructure & Site Selection
-
Optimal Locations for Lunar Bases and GW-Scale Infrastructure
Site selection criteria for lunar facilities supporting gigawatt-scale operations
-
Earthside Facilities: Headquarters, Simulation Lab, and Global Infrastructure
Earth-based support infrastructure requirements and specifications
-
Life Cycle of an Order
End-to-end workflow from compute request to delivery
Power & Cooling Systems
-
AI Power Consumption Projections
Analysis of power requirements for trillion-parameter model training
-
Cooling Methods and Costs Revisited
Updated analysis of passive radiative cooling approaches and economics
-
Lunar Cooling Calculations: Methods and Costs
Detailed cooling system design and cost modeling
-
Maintenance of Passive Radiative Cooling Systems
Long-term maintenance requirements for vacuum cooling infrastructure
-
Molten Salt and Ingredients in Tranquility MSRs
Thorium molten salt reactor specifications, materials, and lifecycle management
-
Nuclear Waste on the Moon: Rules, Methods, Risks
Waste management protocols for lunar nuclear operations
Construction & Equipment
-
Lunar Construction Robots
Robotic construction systems for lunar facility deployment
-
Life Cycle of Containers (Including Heat Pipes)
Container specifications and thermal management integration
-
Transportation of Thorium Reactors
Logistics and safety protocols for reactor deployment to lunar surface
-
Dust and Radiation Hardening
Protection strategies for equipment in lunar dust and radiation environment
-
Lunar Regolith: Friend and Enemy
Managing regolith challenges while leveraging its protective properties
Operations & Workforce
-
Manpower Model: Mature Operations
Workforce planning for sustained 35 GW operations (80-120 FTE steady state)
-
Tranquility Zoo
Operational scenarios and edge case management
-
Pros and Cons of Outsourcing Lunar Mining
Strategic analysis of mining operations structure and partnerships
-
Jimmy Carter: A Lesson in Courage and Hardware Recovery
Case study on resilience and recovery protocols
Contact
For the complete paper set, technical discussions, or partnership inquiries:
Phil Cheevers
Pink House Technology
905-321-2291 • 242-809-1832
info@pinkhouse.tech